This housing Project is located in Eti Osa East Local Council Development Area (LCDA), the project contains 62 blocks of residences, sited on a 10.024 hectares of land with beautiful landscape.
Other features of the LagosHOMS Sangotedo includes:
– Perimeter Fencing. Car Park spaces of 492 cars within compounds and 406 cars at the general car parks.
– Water Treatment Plant and supply with very large storage capacity
– Proper Sewage System
– Full Street Lighting, covered drains and walkways on both sides
– External electrification provided from National Grid with an injection station of 15MVA and 7 transformers of 500KVA capacity each
– Streetlights, Water Treatment Plant and Sewage system all have an alternative power system in case of power shortage from the National Grid
The Phase 2 of the LagosHOMS Sangotedo project is already ongoing and this will add another 444 Units to the current one that was just commissioned.
The LagosHOMS Sangotedo Phase 1 Housing project is also in line with the THEMES Agenda in Making Lagos a 21st Century Economy (The 4th pillar).
#ForAGreaterLagos
